(at least no US aircraft) has done before.--Stephen V Cole
The Pentagon warns that a winning JSF design won't be picked before the fall of next year (months after the current schedule, which is already delayed) due to the need for more testing of the two aircraft and particularly of the critical software. This has thrown the Marines (who desperately need the JSF-V to replace their